Project Details
| Project | KAFD Conference Centre |
| Location | Riyadh, KSA |
| Client | Riyadh Investment Company |
| Consultant | SOM |
| Contractor | Permastelisa-Gartner/Al Reyami Construction |
| DNEC role | Construction engineering and design of temporary structures |
The Conference center is the masterpiece of the KAFD development. Its steel roof with irregular geometry presented a significant construction challenge. Construction methodology and detailing of temporary supporting frame proposed by DNEC allowed independent erection of the structure nodes weighing up to 23 T prior to erection of members. Detailed sequential and de-propping procedure was analyzed, detailed and supervised.