Project Details
Project | Al Gharraf Bridge |
Location | Al Gharraf, Iraq |
Client | Petronas |
Contractor | ICCB |
DNEC role | Structural Consultant |
Design of tri-span (31.5m + 42m + 31.5m), 105m long, two-lane bridge. The deck is designed using 1600mm deep structural steel girders and 250mm in-situ concrete slab to BS EN Standards.
Photo Gallery
Comments are closed.