Project Details
Project | KAFD Skywalk Bridges – Contract C17 |
Location | Riyadh, KSA |
Client | Riyadh Investment Company |
Consultant | Buro Happold |
Contractor | Al Ghurair Construction (Design-and-Build Contract) |
DNEC role | Employed by the Contractor to prepare structural design, fabrication drawings, erection methodology and provide site supervision |
Tubular type Skywalk link bridges are designed to interconnect all buildings at the KAFD development in Riyadh. 57 out of 90 bridges were scheduled for construction during the project’s 1st phase. Complex logistics situation at KAFD site required a detailed construction methodology to be considered at the early stage of the bridge design process. DNEC has undertaken all engineering design services starting from bridge design followed by the preparation of fabrication drawings, construction method statement, planning and erection supervision.