Project Details
Project | CMA Tower |
Location | KAFD Development in Riyadh, Kingdom of Saudi Arabia |
Client | Central Market Authority |
Consultant | HOK – Omrania & Associates JV |
Contractor | Saudi Binladin Group (SBG) – Architecture and Building Construction Division |
DNEC role | Employed by SBG as Specialist Engineering Consultant |
Preparation of Construction Method Statement, Vertical Transportation Study, Building Shortening Study and Building Shortening Compensation Method Statement. Assistance to SBG in review of Method Statements and Workshop Drawings prepared by Subcontractors. Design of temporary structures and permanent structure check at temporary construction conditions.
Development of engineering details and participation in discussions with with SBG and the Engineer on implementation of engineering details. Coordination with SBG and its Subcontractors to ensure incorporation of engineering details into Workshop Drawings.
Comments are closed.