Preparation of building movement prediction study and movement compensation measures. Review of as-build survey reports as the part of building movement monitoring and control program.
Central Processor structural steel connection design for Roof secondary girders and primary girders.
DNEC has been recently employed by the Main Contractor ASOLOUVRE JV to perform third party design review of temporary works as required for installation of the Dome. The scope covers… read more →
DNEC participated as Engineering Consultant in recovery of the bridge from the river OMO that collapsed during launching operation in early 2011. The bridge was recovered, repaired and launched in… read more →
Western Metro station is a landmark project designed to become an integral part of the local neighbourhood. In addition to the Metro station, the development comprises bus station (BRT), food… read more →
DNEC is appointed by Al Ghurair Construction to prepare structural design, fabrication drawings, erection methodology and provide site supervision. Tubular type Skywalk link bridges are designed to interconnect all the… read more →
DNEC is currently employed by Al Reyami Steel Construction to provide engineering services for the installation of structural steel roof elements on KAFD Conference Center in the Kingdom of Saudi… read more →
DNEC were engaged by the award winning Austrian architect Wolfgang Tchapeller to join his team as a lead structural designer. This futuristicly shaped project comprises a 15,000 m2 elevated exhibition… read more →