Omo River Bridge Recovery,Repair and Strengthening Works – Omorate, Ethiopia
DNEC participated as Engineering Consultant in recovery of the bridge from the river OMO that collapsed during launching operation in early 2011.
The bridge was recovered, repaired and launched in its final position from May until July 2013.
e – Books > Recovery And Reconstruction Of The Collapsed Steel Bridge